N0002418C2305 BATH IRON WORKS CORPORATION | $5,498,027,273.86 | 2018-09-27 to 2030-12-20 | ME 04530 | Department of Defense FY18-FY22 DDG 51 CLASS SHIP CONSTRUCTION |
N0001918C1046 THE BOEING COMPANY | $5,496,533,530.53 | 2018-05-08 to 2028-08-31 | MO 63134 | Department of Defense F/A-18E AIRCRAFT |
HQ085621C0001 LOCKHEED MARTIN CORPORATION | $5,475,397,699.21 | 2021-03-25 to 2031-03-31 | AL 35805 | Department of Defense DESIGN, DEVELOPMENT, AND DEVELOPMENTAL TESTING OF THE NEXT GENERATION INTERCEPTOR (NGI) ALL-UP-ROUND (AUR) |
N0001913C9999 NORTHROP GRUMMAN SYSTEMS CORPORATION | $5,375,141,527.12 | 2013-05-13 to 2026-12-31 | FL 32904 | Department of Defense E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2) |
FA861520F0001 LOCKHEED MARTIN CORPORATION | $5,214,634,803.32 | 2020-08-14 to 2029-12-31 | TX 76108 | Department of Defense TAIWAN/MOROCCO F-16 PRODUCTION BLOCK 70/72 |
N0002420C2120 ELECTRIC BOAT CORPORATION | $5,172,271,465.50 | 2019-10-13 to 2028-06-30 | CT 06340 | Department of Defense LEAD YARD SUPPORT |
N0002422C5500 RAYTHEON COMPANY | $5,075,368,902.67 | 2022-03-31 to 2031-07-31 | MA 01810 | Department of Defense AN/SPY-6(V) HARDWARE PRODUCTION |
N0002413C2305 BATH IRON WORKS CORPORATION | $5,025,968,516.81 | 2013-06-03 to 2027-01-31 | ME 04530 | Department of Defense FY13-FY17 DDG 51 CLASS SHIP CONSTRUCTION. |
N0002411C2300 LOCKHEED MARTIN CORPORATION | $4,977,092,374.15 | 2010-12-29 to 2026-12-31 | MD 21220 | Department of Defense BASIC AWARD |
W56HZV23C0024 BAE SYSTEMS LAND & ARMAMENTS L.P. | $4,959,160,180.00 | 2023-03-03 to 2028-05-31 | PA 17408 | Department of Defense EARLY ORDER MATERIAL IN SUPPORT OF THE FUTURE PURCHASE OF 197 AMPVS AND FACILITY CAPACITY EXPANSION EFFORTS TO INCREASE THE AMPV PRODUCTION RATE TO 197 VEHICLES PER YEAR. SUPPORTS UKRAINE EFFORTS. |
N0001921C0011 RTX CORPORATION | $4,865,962,075.84 | 2020-12-01 to 2030-02-28 | CT 06118 | Department of Defense FY21 PBL2 |
N0001919C0010 LOCKHEED MARTIN CORPORATION | $4,840,845,677.77 | 2018-11-15 to 2027-04-01 | TX 76108 | Department of Defense DUAL CAPABLE AIRCRAFT UCA AWARD |
HHSN261200800001E LEIDOS BIOMEDICAL RESEARCH INC | $4,811,722,791.25 | 2008-09-26 to 2024-09-06 | MD 21702 | Department of Health and Human Services TAS::75 0849::TAS OPER OF GOVT R&D GOCO FACILITIES |
N0002418C2406 HUNTINGTON INGALLS INCORPORATED | $4,725,472,612.50 | 2018-08-02 to 2031-03-01 | MS 39567 | Department of Defense LPD 30 LLTM |
W52P1J19F0394 KBR SERVICES, LLC | $4,702,246,054.10 | 2019-04-12 to 2027-03-29 | | Department of Defense LOGISTIC CIVIL AUGMENTATION PROGRAM (LOGCAP) V AWARD FOR EUCOM PERFORMANCE TASK ORDER. |
W9124G17C0104 M1 SUPPORT SERVICES, L.P. | $4,701,689,160.67 | 2017-10-01 to 2027-01-17 | AL 36362 | Department of Defense IGF::OT::IGF |
W58RGZ22C0010 SIKORSKY AIRCRAFT CORPORATION | $4,692,512,769.84 | 2022-06-26 to 2027-12-31 | CT 06614 | Department of Defense BLACK HAWK MY X PRODUCTION AIRCRAFT. FOREIGN MILITARY SALES. |
NAS1510110 RUSSIA SPACE AGENCY | $4,683,777,952.45 | 1993-12-16 to 2028-12-31 | | National Aeronautics and Space Administration JOINT US/RUSSIAN HUMAN SPACE FLIGHT ACTIVITIES |
FA880718C0009 LOCKHEED MARTIN CORP | $4,617,953,767.07 | 2018-09-26 to 2037-01-31 | CO 80125 | Department of Defense GLOBAL POSITIONING SYSTEMS III FOLLOW-ON |
W58RGZ26C0002 THE BOEING COMPANY | $4,591,662,408.00 | 2025-11-25 to 2032-05-30 | AZ 85215 | Department of Defense APACHE NEW BUILD ATTACK HELICOPTERS (AH)-64E FOR FOREIGN MILITARY SALE CUSTOMERS POLAND (QTY OF 96), EGYPT (QTY OF 2) AND KUWAIT (QTY OF 8). THIS INCLUDES ASSOCIATED COMPONENTS AND ACCESSORIES AND LONGBOW CREW TRAINERS (LCTS) |
N0002415C2114 HUNTINGTON INGALLS INC | $4,578,603,345.77 | 2015-06-05 to 2025-07-31 | VA 23607 | Department of Defense DETAIL DESIGN AND CONSTRUCTION CVN 79 |
N0002498C2104 HUNTINGTON INGALLS INC | $4,563,665,299.00 | 1999-11-03 to 2023-05-17 | VA 23607 | Department of Defense
|
FA880708C0010 LOCKHEED MARTIN CORP | $4,538,059,864.90 | 2008-05-15 to 2027-07-23 | PA 18940 | Department of Defense GLOBAL POSITIONING SYSTEM (GPS) IIIA |
W52P1J19F0400 V2X SYSTEMS LLC | $4,536,552,040.46 | 2019-04-12 to 2026-12-31 | | Department of Defense LOGISTICS CIVIL AUGMENTATION PROGRAM (LOGCAP) V SUPPORT SERVICES IN KUWAIT |
N0001925C0070 LOCKHEED MARTIN CORPORATION | $4,524,582,239.00 | 2024-11-22 to 2031-05-30 | TX 76108 | Department of Defense THE PURPOSE OF THIS CONTRACT IS TO AWARD LONG LEAD FUNDING FOR F-35A, F-35B, AND F-35C AIRCRAFT FOR U.S. SERVICES, NON-DOD PARTNERS, AND FMS CUSTOMERS. |
N0002409C2116 HUNTINGTON INGALLS INC | $4,519,300,323.83 | 2009-01-15 to 2025-07-31 | VA 23607 | Department of Defense TAS::17 1611::TAS CVN79 CONSTRUCTION PREPARATION EFFORTS FY09 |
FA880710C0001 RAYTHEON COMPANY | $4,508,053,634.72 | 2010-02-25 to 2026-11-30 | CO 80011 | Department of Defense GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
DEAC3010CC40017 FLUOR-BWXT PORTSMOUTH LLC | $4,464,785,978.44 | 2010-08-16 to 2025-09-30 | OH 45661 | Department of Energy PORTSMOUTH GASEOUS DIFFUSION PLANT DECONTAMINATION AND DECOMMISSIONING PROJECT |
HQ014719C0004 THE BOEING COMPANY | $4,442,892,884.10 | 2019-03-18 to 2029-03-31 | AL 35801 | Department of Defense GBI/AUR PROGRAM MANAGEMENT/SYSTEMS ENG |
NNM07AA75C NORTHROP GRUMMAN SYSTEMS CORPORATION | $4,429,530,857.00 | 2006-04-17 to 2026-12-31 | UT 84307 | National Aeronautics and Space Administration FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS |
W31P4Q23C0005 LOCKHEED MARTIN CORPORATION | $4,427,685,266.18 | 2023-03-30 to 2029-06-30 | FL 32819 | Department of Defense AGMS PRODUCTION |
FA862511C6597 LOCKHEED MARTIN CORP | $4,410,630,126.34 | 2011-02-01 to 2025-07-21 | GA 30063 | Department of Defense C-130J FIVE YEAR OPTION CONTRACT (FYOC) IV |
W56HZV20C0050 OSHKOSH DEFENSE LLC | $4,131,410,696.62 | 2020-03-13 to 2026-09-25 | WI 54902 | Department of Defense CONTRACT W56HZV-20-C-0050 IS ISSUED TO PROVIDE CONTINUATION OF CONTRACT W56HZV-15-C-0095. |
FA862516C6599 THE BOEING COMPANY | $4,044,045,671.81 | 2016-01-04 to 2028-07-31 | WA 98108 | Department of Defense ACAT I, AFLCMC/WLJK, PRESIDENTIAL AIRCRAFT RECAPITALIZATION |
N0003019C0025 LOCKHEED MARTIN CORP | $4,015,810,207.91 | 2018-12-20 to 2026-09-30 | CO 80125 | Department of Defense IR CPS WS DEVELOPMENT AND INTEGRATION |
W56HZV15CA001 BAE SYSTEMS LAND AND ARMAMENTS L.P. | $4,013,297,152.88 | 2014-12-23 to 2025-09-30 | PA 17408 | Department of Defense THIS ACTION IS COST PLUS INCENTIVE-FEE (CPIF) 52 MONTH ENGINEERING AND MANUFACTURING DEVELOPMENT CONTRACT, WITH THREE FIXED PRICE INCENTIVE (SUCCESSIVE TARGETS) (FPI(S)) OPTION YEARS OF LOW RATE INITIAL PRODUCTION (LRIP) FOR THE ARMORED MULTI-PURPOSE VEHICLE (AMPV) REQUIREMENT. THE AMPV FAMILY OF VEHICLES (FOV) IS A MATERIEL SOLUTION REPLACEMENT FOR THE M113 FOV TO MITIGATE CURRENT AND FUTURE CAPABILITY GAPS IN FORCE PROTECTION, MOBILITY, RELIABILITY, AND INTEROPERABILITY BY MISSION ROLE VARIANT TO SUPPORT THE ARMORED BRIGADE COMBAT TEAM (ABCT) ACROSS THE SPECTRUM OF CONFLICT. THE AMPV FOV WILL REPLACE THE FIVE MISSION ROLES CURRENTLY PERFORMED BY THE M113 FOV BY TRANSFERRING THE CURRENT M113 MISSION EQUIPMENT PACKAGES (MEP) TO A NEW VEHICLE PLATFORM. THE AMPV VEHICLE FLEET WILL CONSIST OF THE FOLLOWING FIVE VARIANTS TAILORED TO SPECIFIC MISSION ROLES WITHIN ABCT: GENERAL PURPOSE (GP) VEHICLE MISSION COMMAND (MCMD) VEHICLE MORTAR CARRIER (MC) VEHICLE MEDICAL EVACUATION (ME) VEHICLE AND MEDICAL TREATMENT (MT) VEHICLE. A TOTAL QUANTITY OF 29 VEHICLES WILL BE DELIVERED DURING EMD (INCLUDING SYSTEM SUPPORT PACKAGES, SPECIAL TOOLS AND TEST EQUIPMENT, AND BALLISTIC HULLS), WITH 52 (LRIP OPTION YEAR 1), 105 (LRIP OPTION YEAR 2), AND 130 (LRIP OPTION YEAR 3) VEHICLES ANTICIPATED DURING THE LRIP OPTION YEARS. RANGE PRICING IS INCLUDED IN THE CONTRACT FOR OPTION PERIODS 2 AND 3. |
M6785416C0006 BAE SYSTEMS LAND AND ARMAMENTS L.P. | $3,974,074,221.15 | 2015-11-24 to 2028-06-30 | PA 17408 | Department of Defense IGF::OT::IGF |
FA863423F0048 THE BOEING COMPANY | $3,931,679,465.97 | 2023-09-27 to 2029-04-30 | MO 63134 | Department of Defense F-15EX LOT 5 ADVANCED PROCUREMENT |
N0001924C0009 SIKORSKY AIRCRAFT CORPORATION | $3,919,238,209.38 | 2023-12-15 to 2034-02-28 | CT 06615 | Department of Defense CH-53K FRP LOT 9 AND OPTION FRP LOT 10 LONG LEAD ITEMS |
DESC0004645 UCOR LLC | $3,900,788,934.07 | 2011-04-29 to 2021-07-31 | TN 37830 | Department of Energy DECONTAMINATION AND DECOMISSIONING OF THE EAST TENNESSEE TECHNOLOGY PARK (ETTP)AT OAK RIDGE, TN. |
89233224CNA000004 PANTEXAS DETERRENCE, LLC | $3,865,509,200.38 | 2024-06-13 to 2029-11-14 | TX 79120 | Department of Energy CONTRACT 89233224CNA000004 FOR THE MANAGEMENT AND OPERATION OF THE PANTEX PLANT |
N0001908C0028 LOCKHEED MARTIN CORPORATION | $3,829,164,350.67 | 2008-05-14 to 2021-06-08 | TX 76101 | Department of Defense JSF LRIP LOT III - AAC |
FA862518F7027 LOCKHEED MARTIN CORP | $3,811,949,623.54 | 2018-07-19 to 2026-04-30 | GA 30063 | Department of Defense C-130J, ACAT 1, FIVE YEAR ORDERING CONTRACT, MYP3 AP |
W58RGZ19C0027 GENERAL ATOMICS AERONAUTICAL SYSTEMS, INC. | $3,792,314,138.22 | 2019-04-24 to 2027-04-23 | CA 92064 | Department of Defense REQUIREMENT IS FOR THE PROCUREMENT OF PERFORMANCE BASED LOGISTICS SUPPORT SERVICES FOR THE MQ-1C GRAY EAGLE UNMANNED AIRCRAFT SYSTEM. |
N0002421C2106 HUNTINGTON INGALLS INC | $3,762,094,111.67 | 2021-02-19 to 2026-10-06 | VA 23607 | Department of Defense FY21 RCOH ACCOMPLISHMENT |
F3365791C0006 LOCKHEED MARTIN AERONAUTICAL SYSTEMS SUPPORT COMPANY | $3,693,487,225.00 | 1997-02-05 to 2006-09-30 | TX 76108 | Department of Defense
|
FA820518F0001 LOCKHEED MARTIN CORPORATION | $3,667,251,155.64 | 2018-01-01 to 2026-07-30 | TX 76108 | Department of Defense IGF::OT::IGF COMPREHENSIVE F-22 VEHICLE SUSTAINMENT SERVICES |
NNK17MA01T SPACE EXPLORATION TECHNOLOGIES CORP. | $3,549,243,793.00 | 2016-12-30 to 2030-12-31 | FL 32899 | National Aeronautics and Space Administration IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3,DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. SPACEX CCTCAP POST CERTIFICATION MISSIONS 3-6(PCM-3-6) TASK ORDER AGAINST NNK14MA74C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. |
DAAH2302C0006 SIKORSKY AIRCRAFT CORPORATION | $3,518,890,935.97 | 2002-09-26 to 2020-01-31 | CT 06614 | Department of Defense 200212!002339!2100!AH23 !USA AVIATION AND MISSILE COMMAND!DAAH2302C0006 !A!N! !N! !20020926!20071231!835551474!835551474!001344142!N!SIKORSKY AIRCRAFT CORPORATION !6900 MAIN STREET !STRATFORD !CT!06615!74260!001!09!STRATFORD !FAIRFIELD !CONN !+000223785585!N!Y!001534999153!1520!AIRCRAFT ROTARY WING !A1A!AIRFRAMES AND SPARES !1000!NOT DISCERNABLE OR CLASSIFIED !336411!E! !3! ! ! ! ! !99990909!B! ! !A! !D!N!J!1!001!N!1G!A!Y!A! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! !Y! ! !0001! |
75ACF121C00020 RAPID DEPLOYMENT INC | $3,516,373,308.21 | 2021-03-24 to 2025-09-30 | TX 79906 | Department of Health and Human Services THE PURPOSE OF THIS CONTRACT IS TO PROVIDE THE FULL COMPLEMENT OF SERVICES NECESSARY TO CARE FOR UC IN ORR CUSTODY INCLUDING FACILITIES SET-UP, MAINTENANCE, AND SUPPORT INTERNAL AND PERIMETER (IF APPLICABLE) SECURITY, DIRECT CARE AND SUPERVISION INC |