S. 4101: Stormwater Enforcement and Permitting Act of 2006
Before you vote › Federal bills
S. 4101: Stormwater Enforcement and Permitting Act of 2006
109th Congress · introduced 2006-12-07 · Environmental Protection · Latest: Read twice and referred to the Committee on Environment and Public Works.
federal
Follow this bill, step by step
- Where it came from: introduced 2006-12-07 · official record
- Who proposed it: Sen. Inhofe, James M. [R-OK] · what a sponsor is
- What happened next: no floor votes in our records yet. Why?
- Where it stands now: Read twice and referred to the Committee on Environment and Public Works. Not final yet: this can still change. We check for updates every day.
- If it becomes law and spends money: follow the money to money laws, then agencies and contracts and grants.
Official title
Stormwater Enforcement and Permitting Act of 2006
Plain summary
Stormwater Enforcement and Permitting Act of 2006 - Amends the Federal Water Pollution Control Act to direct the Administrator of the Environmental Protection Agency (EPA) to provide an operator a reasonable opportunity to correct a violation of a permit condition for a site with residential construction activity before initiation of an enforcement action, if such violation may be rectified by modifying, revising, or supplementing records or paperwork. Prohibits such an opportunity from being provided: (1) to the operator of any residential construction site that failed to obtain coverage under a national pollutant discharge elimination system permit; or (2) for a record or paperwork violation that resulted in a violation of a water quality standard. Prohibits more than one opportunity to correct violations of the same condition. Prohibits the Administrator from requiring a permit for stormwater runoff from such a site if: (1) the runoff enters a municipal separate storm sewer system that is covered by a permit and the operator is in compliance with runoff requirements; and (2) such site has minimal potential for soil erosion. Requires the Administrator to coordinate enforcement of stormwater discharge permits with states. Prohibits the Administrator from paying any state penalty for a violation of a permit for such a discharge. Requires the Administrator to establish a program that will develop and distribute to site operators a pamphlet that explains permitting requirements for stormwater discharges. Authorizes the Administrator or the state to issue a general permit for no more than five years on a state, regional, or nationwide basis to cover any category of discharges, sludge use, disposal practices, or facilities. Declares that the Administrator or state is not required to review, approve, or provide an opportunity for public comment on any application for a discharge under a general permit.
Congressional Research Service summary (Introduced in Senate), quoted unchanged (nonpartisan). Read the source.
What a vote does
A “Yea” vote
If it passes both chambers and is signed, it becomes law.
A “Nay” vote
If it is not passed, current law stays as it is.
PSI Sci description of the legislative step (not an opinion).
What does this mean? (plain words)
Official text
Stormwater Enforcement and Permitting Act of 2006
Source: Congressional Research Service summary (Introduced in Senate)
AI explanation – may be wrong, check the official text
No AI explanation yet. It takes up to a minute to write and is then saved for everyone.
Limited to a few requests an hour per person.
The strongest published arguments
Arguments for (supporters)
Needs sources: no published arguments on this side yet. We only show items backed by a published source. Suggest one.
Arguments against (opponents)
Needs sources: no published arguments on this side yet. We only show items backed by a published source. Suggest one.
Alternatives
Needs sources: no published alternatives yet (for example a different bill, a law instead of an amendment, or keeping current law). We only show items backed by a published source. Suggest one.
How did my representative vote? · This bill's floor votes
Officials and money
Sponsor: Sen. Inhofe, James M. [R-OK] · 1 cosponsors
Cost estimate: No cost estimate published yet.
Cosponsors on this site
No linked floor roll calls in our collected records yet. This does not mean the bill has never had a vote. Check the official bill history.
Words on this page, explained (1)
- Public comment
- A chance for anyone to tell a government agency what they think about a proposed rule or plan before it is final. Agencies must consider the comments they receive.
Plain meanings written from linked sources. All words.
Sources
- Congressional Research Service summary (Introduced in Senate)
- Congress.gov
- Data: GovInfo BILLSTATUS bulk data (Library of Congress), BILLSTATUS-109s4101.xml <https://www.govinfo.gov/bulkdata/BILLSTATUS/109/s>
Record fed-us-cong109-s4101 · catalog fed-us-congress-bills-cong109 · updated 2026-11-15 by psicol fed-bills-cong109