111th Congress · introduced 2009-01-07 · Water Resources Development · Latest: Referred to the Subcommittee on Water and Power.
federal
Follow this bill, step by step
- Where it came from: introduced 2009-01-07 · official record
- Who proposed it: Rep. Thompson, Mike [D-CA-1] · what a sponsor is
- What happened next: no floor votes in our records yet. Why?
- Where it stands now: Referred to the Subcommittee on Water and Power. Not final yet: this can still change. We check for updates every day.
- If it becomes law and spends money: follow the money to money laws, then agencies and contracts and grants.
Official title
North Bay Water Reuse Program Act of 2009
Plain summary
North Bay Water Reuse Program Act of 2009 - Amends the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior, contingent upon a finding of feasibility and acting through a cooperative agreement with the state of California or a subdivision thereof, to enter into cooperative agreements with eligible entities in the North San Pablo Bay watershed located in Marin, Napa, Solano, and Sonoma Counties for the planning, design, and construction of water reclamation and reuse facilities and recycled water conveyance and distribution systems. Directs the Secretary and such an entity to use the design work and environmental evaluations initiated by non-federal entities and the Corps of Engineers in that watershed to the maximum extent practicable. Requires any such cooperative agreement to require the program to be carried out in two phases, during which the Secretary and an entity shall complete the planning, design, and construction of: (1) the main treatment and main conveyance systems; and (2) the sub-regional distribution systems. Limits the federal share to 25% of the total cost of the first phase of the project. Allows the non-federal share to be in the form of in-kind services that the Secretary determines would contribute substantially toward the completion of the water reclamation and reuse project. Prohibits the Secretary from providing funds for operation and maintenance of the project.
Congressional Research Service summary (Introduced in House), quoted unchanged (nonpartisan). Read the source.
What a vote does
A “Yea” vote
If it passes both chambers and is signed, it becomes law.
A “Nay” vote
If it is not passed, current law stays as it is.
PSI Sci description of the legislative step (not an opinion).
What does this mean? (plain words)
Official text
North Bay Water Reuse Program Act of 2009
Source: Congressional Research Service summary (Introduced in House)
AI explanation – may be wrong, check the official text
No AI explanation yet. It takes up to a minute to write and is then saved for everyone.
Limited to a few requests an hour per person.
The strongest published arguments
Arguments for (supporters)
Needs sources: no published arguments on this side yet. We only show items backed by a published source. Suggest one.
Arguments against (opponents)
Needs sources: no published arguments on this side yet. We only show items backed by a published source. Suggest one.
Alternatives
Needs sources: no published alternatives yet (for example a different bill, a law instead of an amendment, or keeping current law). We only show items backed by a published source. Suggest one.
How did my representative vote? · This bill's floor votes
Officials and money
Sponsor: Rep. Thompson, Mike [D-CA-1] · 2 cosponsors
Cost estimate: No cost estimate published yet.
Cosponsors on this site
Sponsor's campaign money: Rep. Thompson, Mike [D-CA-1] reported raising $5.5 million (2025–2026). Details. Shown for context only; it does not mean any donor supported this bill.
No linked floor roll calls in our collected records yet. This does not mean the bill has never had a vote. Check the official bill history.
Words on this page, explained (1)
- Authorization
- A law that creates or continues a government program and says what it may do, often with a suggested spending ceiling. An authorization alone does not provide money; a separate appropriation does.
Plain meanings written from linked sources. All words.
Sources
- Congressional Research Service summary (Introduced in House)
- Congress.gov
- Data: GovInfo BILLSTATUS bulk data (Library of Congress), BILLSTATUS-111hr285.xml <https://www.govinfo.gov/bulkdata/BILLSTATUS/111/hr>
Record fed-us-cong111-hr285 · catalog fed-us-congress-bills-cong111 · updated 2026-11-15 by psicol fed-bills-cong111